I Compartment (Subnautica): Difference between revisions
(Adding categories) Tag: categoryselect |
(Adding categories) Tag: categoryselect |
||
Line 29: | Line 29: | ||
[[Category:Requires Blueprint]] |
[[Category:Requires Blueprint]] |
||
[[Category:Constructed with Habitat Builder]] |
[[Category:Constructed with Habitat Builder]] |
||
[[Category:Uses Energy]] |
Revision as of 19:47, 30 May 2016
The Corridor or I-Corridor is the most basic Seabase module.
It is constructed with the Habitat Builder and can be placed on top of a Foundation, although It is possible to build off the foundation. The Corridor module can also be deconstructed, but then all attached components on that single module must be deconstructed first.
At the surface a Corridor has an integrity level of 9 and every Corridor added reduces the integrity by -1 level. It can be rotated before placing it by pressing Q or E.
Recipe
Expansion
- Hatches can be placed on the side-panels, the end-panels, and both the floor and ceiling.
- Windows can be placed on the side-panels, the end-panels, and the ceiling.
- Ladders can be placed on the floor and ceiling when there is an adjacent seabase module to connect.
- Reinforcements can be placed on the side-panels.
- The Corridor can be expanded with other modules from its two end-panels.
- Smaller Components such as the Fabricator can be placed inside as well.
Gallery
Corridor with expansions: Hatch, Window and Reinforcement