Multipurpose Room (Subnautica): Difference between revisions
(Editing a gallery) Tag: gallery |
(added expansion) Tag: sourceedit |
||
Line 1: | Line 1: | ||
[[File:Room.png|thumb]] |
[[File:Room.png|thumb]] |
||
The '''Generic Room''' is an in-development [[Seabases|Seabase Module]]. It provides a much larger space for movement than the [[Corridor]]. |
The '''Generic Room''' is an in-development [[Seabases|Seabase Module]]. It provides a much larger space for movement than the [[Corridor]]. It is constructed with a [[Builder]] and can be placed on top of a [[Foundation]]. |
||
==Recipe== |
==Recipe== |
||
{{Recipe|item=Titanium|count=6|machine=Builder|result=Room}} |
{{Recipe|item=Titanium|count=6|machine=Builder|result=Room}} |
||
==Expansion== |
|||
*[[Hatch|Hatches]] cannot be placed on any part of the '''Generic Room''' |
|||
*[[Window|Windows]] can be placed on all eight of the side-panels. |
|||
*[[Ladder|Ladders]] currently cannot be placed to connect multiple floors. |
|||
*[[Reinforcement|Reinforcements]] can be placed on all eight of the side-panels. |
|||
*The '''Generic Room''' can be expanded with other modules from It's side-panels. However, the side-panels that are on a 45 degree angle to the module construction cannot be expanded from. The '''Generic Room''' can be expanded vertically upwards using a second '''Generic Room'''. |
|||
==Gallery== |
==Gallery== |
Revision as of 19:49, 13 July 2015
The Generic Room is an in-development Seabase Module. It provides a much larger space for movement than the Corridor. It is constructed with a Builder and can be placed on top of a Foundation.
Recipe
×6
Expansion
- Hatches cannot be placed on any part of the Generic Room
- Windows can be placed on all eight of the side-panels.
- Ladders currently cannot be placed to connect multiple floors.
- Reinforcements can be placed on all eight of the side-panels.
- The Generic Room can be expanded with other modules from It's side-panels. However, the side-panels that are on a 45 degree angle to the module construction cannot be expanded from. The Generic Room can be expanded vertically upwards using a second Generic Room.